On P&H 4100C Boss shovel crawler dimensions (Table1) The crawler shoes were generated in Solidworks, based on the actual crawler shoe for the same shovel 1,2 The oilThe P&H 4100C Boss shovel during the loading duty cycle is reported in the field study undertaken by Joseph,8 Joseph et al,9 & Sharif Abadi et al10 They measured ground bearing pressure acting under shovel front and rear track for three idealized shoveltruck loading duty cycles using passive seismic instrumentation The present study uses ALBERTA P&H MINING EQUIPMENT recently introduced the 4100C BOSS with Centurion AC drive to the SUNCOR oil sands mine north of Fort McMurray This development resulted from a twoyear project to integrate current AC technology with the advanced P&H Centurion supervisory control system

P H 4100c Boss Shovel By Evan Sisson At Coroflot Com